Skip to content
CPH / COOPER PLUMBING & HEATING

THE BATHROOM SPECIALISTS

Bathrooms, designed and installed by one team.

From the first measure to the final seal. Planning, plumbing and installation handled together.

HOW A PROJECT WORKS

A clear process, so you always know what happens next.

01

Brief consultation

We start by understanding the room, how you want to use it and what a good result looks like.

02

Site visit and measuring

We assess the space, the plumbing and the heating so nothing about the plan is guesswork.

03

Design and quotation

You get a clear proposal with the layout, the products and a detailed quote before any work starts.

04

Installation

The room is stripped out, renewed and finished by our own team, with the house protected throughout.

05

Handover and aftercare

We walk you through the finished room, explain the guarantees and we're still at the end of the phone afterwards.

THE DESIGN VISIT

It starts with a proper conversation.

The first visit is about the room and how you actually use it. Morning routines, storage, who showers and who soaks. From that, we'll sketch the layout options, talk through what's possible within the space and the budget, and put the plan together.

Everything after that is ours to manage: supply, schedule, trades and the final finish. You'll see the quote before anything starts, and you'll always know what's happening next.

Most customers stay out of the showrooms entirely. We bring the options to your kitchen table, source everything to match, and handle the details that are easy to get wrong.

WHERE WE FIT BATHROOMS

Bathroom fitters across Lancashire.

We design and install bathrooms across Blackburn, Darwen, the Ribble Valley and the surrounding Lancashire towns. Choose your area for local coverage, recent work nearby and the questions homeowners ask us most.

WHAT IS INCLUDED

Everything needed for a finished room.

Full design and layout advice
Supply of the suite, tiling and fittings
Plumbing and heating work by the same team
Strip-out and responsible waste removal
Clean-up after every day of work
Workmanship guarantees and product warranties

RECENT BATHROOM WORK

Real rooms, recently finished by CPH.

Bathroom installation project 1 by CPH
Bathroom installation project 2 by CPH
Bathroom installation project 3 by CPH
Bathroom installation project 4 by CPH
Bathroom installation project 5 by CPH
Bathroom installation project 6 by CPH
Start your bathroom project

Wondering what it costs? Start with our honest bathroom cost guide, or read the wet room vs shower room comparison.

COMMON QUESTIONS

Straight answers, before you book.

How much does a new bathroom cost?

It depends on the room and the specification, so we price each job properly rather than guessing. Our cost guide breaks down the ranges, and a free site visit gets you an itemised quote.

How long will my bathroom take?

Most full installations take one to two weeks on site. You'll get a clear schedule before we start, and a tidy site at the end of every day.

Do you handle the plumbing and tiling?

Yes, it's all one team: strip-out, plumbing, tiling, fitting and the final finish. That's the point of hiring a specialist rather than a coordinator.